Production orders and recipes for an Albanian manufacturer
Updated
A small Albanian producer that assembles or packs goods from bought-in materials can record production in 4softerp.net. You define a one-level recipe, raise a production order, components leave stock at cost, and the finished product is received with a journal entry.
What the production module covers
A recipe, or bill of materials (BOM), lists the components and quantities for one unit of a finished product. It has one level: components are bought or stocked items, not other recipes.
A production order says how many units you make. Completing it moves stock and posts the accounting entry, so nothing is posted by hand. Components must be in stock at completion.
An example: herbal tea packs near Shkodër
A company that packs mountain tea from the northern highlands builds a gift box from a carton, two pouches of tea, a sachet of honey and a label.
The planner creates an order for 500 boxes. On completion the system takes 500 cartons, 1,000 pouches, 500 sachets and 500 labels from stock at current cost and receives 500 finished boxes, which are then sold with a delivery like any product.
How cost is built
The cost of the finished product is the cost of the components consumed, following the costing method of the component warehouse. Labour and overhead are not added to product cost. If you need them in the cost of goods, handle that adjustment outside this module with your accountant.
What this module does not do
For a sub-assembly, make it as its own order first and then use it as a component.
- One-level recipes only.
- No automatic material planning.
- No batch or serial numbers in production.
- No labour or overhead in cost.
Planning around the module in practice
Before you create the first recipe, list the components with their units and check that each exists as a stocked product. A box that needs a carton, two pouches, a sachet and a label needs four product records and four quantities in the warehouse.
Seasonal producers, for example those preparing for the summer tourist season on the coast, can raise several production orders ahead of the peak and use reservations so that sales do not consume components needed for planned runs.
After completion, check the journal entry once against your own calculation. Record scrap and wastage honestly: if real consumption is higher than the recipe, note the reasons and adjust the recipe at the next review.
Keep finished goods and components in separate warehouses if that helps your team see at a glance what is ready to ship. A packing hall near Shkodër and a finished-goods store in Tirana can each have their own warehouse and costing method, and moving goods between them stays visible in the stock records and the journal.
Frequently asked questions
Can a recipe contain another recipe?
Not directly. Run a production order for the sub-assembly, receive it into stock and then use it as an ordinary component.
Is labour included in the product cost?
No. The cost equals the cost of the components consumed. Adjust for labour and overhead outside the system if needed.
Does the system plan production for me?
No. A planner creates each production order, and the system handles stock consumption, receipt and the accounting entry.