Bills of Materials and Production Orders for a Small Estonian Workshop OÜ
Updated
A small workshop that assembles furniture kits needs to know what each kit consumes and what it costs. 4softerp.net supports single-level recipes (bills of materials) and production orders that take components out of stock and receive the finished product, with a journal entry. This guide describes the flow and its limits.
The recipe: one level only
A bill of materials lists the components of a finished product and the quantity of each. For a flat-pack bookshelf kit, that might be oak boards, a bag of fittings and a printed instruction sheet. The recipe is single-level: the components are bought or stocked items, not other recipes.
If your product has sub-assemblies that are themselves built from parts, the system will not follow the chain. You would record each sub-assembly as its own product and its own order.
Keep recipes tidy by giving every component a stable product code and unit of measure. A kit that uses 1.2 metres of edging strip needs the same unit everywhere it appears, otherwise stock levels drift without anybody noticing.
Running a production order
A production order says how many units to make and in which warehouse. When you complete it, the system consumes the components from stock at their current cost and receives the finished product into stock at the resulting cost. A journal entry records the move from component stock to finished-goods stock.
If components are short when you complete the order, the system cannot consume stock that is not there, so check availability first. Reserving the components for the order is a sensible habit, as it keeps the shop company from selling the same boards in the meantime.
- Components leave stock at average or FIFO cost
- Finished goods enter stock at the consumed cost
- The journal entry posts automatically
What the cost includes
The cost of a finished kit equals the cost of its components. Labour and workshop overheads are not added by the system. If your accountant wants a full production cost, you would add those allocations through a manual journal entry outside the order.
Many small Estonian workshops prefer to see material cost only, because labour is paid through payroll and tracked elsewhere. For them the simple rule is an advantage: the cost of a kit is easy to explain and easy to check against the supplier invoices.
What is not included
There is no automatic material planning, no multi-level explosion of recipes and no lot or serial tracking within production. Use the production order for the straightforward case it handles well: known components, known quantities, one finished product.
In the Estonian group
In the example group, the workshop OÜ builds the kits and then sells them to the warehouse OÜ. Stock and cost stay in the workshop books until the sale. Statutory reporting to the Business Register under the Raamatupidamise seadus remains your accountant's job, not something the ERP files.
Frequently asked questions
Can a recipe contain another recipe?
No. Bills of materials are single-level. If a component is itself assembled, create it as a separate finished product with its own recipe and run a separate production order for it first.
Is labour added to the product cost?
No. The cost of a finished product is the cost of the components consumed. Labour and overheads are not included automatically, so any allocation has to be booked separately by your team or accountant.
Does it plan production automatically?
No. There is no material requirements planning. You create production orders yourself when you decide to build a quantity, and the system handles the stock movements and the journal entry.