Production orders

Production orders and bills of materials for a Finnish industrial workshop Oy

Updated

A small Finnish workshop Oy that assembles products from bought parts can record its production in 4softerp.net. You define a one-level recipe, raise a production order, the components are consumed from stock at cost, and the finished product is received with a journal entry.

What the production module covers

The module is deliberately simple. A recipe, also called a bill of materials (BOM), lists the components and quantities needed for one unit of a finished product. It has one level only: components are bought or stocked items, not other recipes.

A production order says how many units you are making. Completing it moves stock and posts the accounting entry, so the workshop does not post anything by hand.

Components must exist in stock when the order is completed, so a planner checks availability first. Reservations can hold components for an order so that a sale does not use up the same parts.

A workshop example: hose assemblies

Consider a workshop Oy in Tampere that builds hydraulic hose assemblies. One assembly needs one hose length, two fittings and a protective sleeve, all held in the workshop's warehouse.

The planner creates a production order for 50 assemblies. On completion the system takes 50 hose lengths, 100 fittings and 50 sleeves out of stock at their current cost and receives 50 finished assemblies into stock.

The finished assemblies are then sold like any other product, through a sales document with a delivery, and they leave stock at the cost they received.

How cost is built

The cost of the finished product is the cost of the components consumed. The journal entry records the consumption of components and the receipt of the finished goods. Cost therefore moves from the component warehouse to the finished-goods stock, and the journal shows both sides of that movement.

Since the product cost is the sum of component costs, the costing method of the component warehouse flows through: components held under FIFO are consumed oldest layer first, and the assembly takes that cost.

Labour and overhead are not added to the product cost, and no machine-hour or shop-floor rates are applied either. If your workshop wants to carry manufacturing labour in the cost of goods, that adjustment has to be handled outside this module, with your accountant.

What this module does not do

There is no automatic planning of what to make or buy, no multi-level assemblies and no lot or serial tracking in production. If an assembly contains a sub-assembly, you make the sub-assembly as its own order first and then use it as a component.

The simplicity is intentional. For a small workshop it is often enough to know what was consumed, what was produced and what it cost in parts, without a planning system in the middle.

  • One-level recipes only.
  • No automatic material planning.
  • No batch or serial numbers in production.
  • No labour or overhead in cost.

Frequently asked questions

Can a recipe contain another recipe?

Not directly. Recipes have one level. For a sub-assembly, run a production order for it first, receive it into stock, and then use it as an ordinary component in the next recipe.

Is labour included in the product cost?

No. The cost of a finished product equals the cost of the components consumed. Labour and overhead are not added by the module, so adjust that outside the system if you need it.

Does the system plan production for me?

No. There is no automatic material or capacity planning. A planner creates each production order, and the system handles stock consumption, receipt and the accounting entry.