Production orders

Production orders and bills of materials for a UK manufacturing Ltd

Updated

A small UK manufacturer that assembles products from bought-in parts can record production in 4softerp.net. You define a one-level recipe, raise a production order, components are consumed from stock at cost, and the finished product is received into stock with a journal entry.

What the production module covers

The module is deliberately simple. A recipe, or bill of materials (BOM), lists the components and quantities for one unit of a finished product. It has one level only: components are bought or stocked items, not other recipes.

A production order says how many units you are making. Completing it moves stock and posts the accounting entry, so the workshop posts nothing by hand.

Components must be in stock when the order is completed, so a planner checks availability first. Reservations can hold components so a sale does not use the same parts.

A workshop example: control panels

Consider a Manchester Ltd that builds electrical control panels. One panel needs an enclosure, a contactor, two circuit breakers and a length of busbar, all held in its warehouse.

The planner raises an order for 20 panels. On completion the system takes 20 enclosures, 20 contactors, 40 breakers and 20 busbar lengths from stock at their current cost and receives 20 finished panels into stock.

The panels are then sold like any other product, through a sales document with a delivery, and leave stock at the cost they were received at. A Birmingham or Leeds manufacturer can run this next to an ordinary trading business. The same warehouse can hold bought-in goods for resale and components for production, and every movement carries its cost into the journal.

How cost is built

The cost of the finished product is the cost of the components consumed. The journal entry records the consumption and the receipt of finished goods, so cost moves from the component warehouse to finished-goods stock.

The costing method of the component warehouse flows through: components held under FIFO are consumed oldest layer first, and the panel takes that cost.

Labour and overhead are not added to the product cost, and no machine-hour or shop-floor rates are applied. If you want manufacturing labour carried in the cost of goods, that adjustment happens outside this module, with your accountant.

What this module does not do

There is no automatic planning of what to make or buy, no multi-level assemblies and no lot or serial tracking in production. For a sub-assembly, make it as its own order first and then use it as a component.

For a small workshop it is often enough to know what was consumed, what was produced and what it cost in parts.

Teams coming from a spreadsheet usually find the biggest gain is simply having one record of what was built on which day, instead of reconstructing it from delivery notes and a wall planner.

  • One-level recipes only.
  • No automatic material planning.
  • No batch or serial numbers in production.
  • No labour or overhead in cost.

Frequently asked questions

Can a recipe contain another recipe?

Not directly. Recipes have one level. Run a production order for the sub-assembly, receive it into stock, then use it as an ordinary component in the next recipe.

Is labour included in the product cost?

No. The cost of a finished product equals the cost of the components consumed. Adjust for labour and overhead outside the system if you need it.

Does the system plan production for me?

No. A planner creates each production order, and the system handles stock consumption, receipt and the accounting entry.