Production Orders and Bills of Materials for Lithuanian Manufacturers

Updated

A manufacturing UAB needs to know what a finished product cost in materials. 4softerp.net holds single-level recipes, and a production order takes the components out of stock at cost and receives the finished product back in, with an accounting entry.

Recipes at one level

A recipe, or bill of materials, lists the components and quantities needed for one unit of a finished product. It is one level deep: a finished item is built from components held in stock, and those components are not themselves broken down further.

In practice this suits workshops that assemble a product in a single stage, such as cutting, fitting and packing a standard cabinet. A product with several stages can still be handled by producing each stage as its own item in turn, with the intermediate part held in stock between orders.

Preparing stock before a production run

A production order can only consume what is in the warehouse, so the planner should check component availability first. Stock held for customer orders through reservations is not free to use, and the order should account for that.

If a component is missing, the sensible step is to raise a purchase and receive the goods before launching the order. This keeps the ledger consistent, since every unit consumed has a cost that came from a posted receipt.

Finished products enter stock at the cost of the components used. From that point they behave like any other item: they can be reserved, delivered to customers and returned, and their later cost follows the costing method of the warehouse where they are held.

What a production order does

When you launch a production order, the components are consumed from the chosen warehouse at their stock cost, and the finished product is received into stock. The accounting entry for that movement is posted at the same time.

Because the cost comes from the stock ledger, the weighted average or FIFO method of the warehouse decides what the components cost.

A worked example from a joinery

A Klaipeda joinery UAB builds window frames. The recipe for one frame lists pine profile lengths, a pair of hinges and a glazing bead. The planner raises an order for two hundred frames. Components leave the warehouse, two hundred frames enter stock, and the entry reflects the material cost.

If the pine warehouse runs FIFO, the older, cheaper boards are costed first, so the frames reflect the price actually paid.

What is deliberately not included

Labour and overhead are not added to product cost, so the cost shown is material cost only. There is no multi-level production, no batch or serial tracking inside production, and no automatic planning. Decisions about what to build and when remain with your planner.

Your accountant can add labour and overhead outside the ERP when preparing statutory figures.

  • Single-level recipes only
  • Material cost from stock, no labour or overhead
  • No automatic planning or MRP
  • No lots or serial numbers in production

Frequently asked questions

Can a recipe contain another recipe?

No. Recipes are single level. A finished product is made from components in stock. If an intermediate item is needed, produce it first so it sits in stock as a component.

Is labour included in the product cost?

No. A production order costs the finished product only from the components consumed at stock cost. Labour and overhead are not added inside the ERP, so add them elsewhere if you need them.

Does the ERP plan production automatically?

No. There is no MRP or automatic planning. You create production orders yourself, and the system then handles stock consumption, receipt of the finished product and the journal entry.