Production orders and bills of materials for a Maltese food producer
Updated
A small Maltese producer that assembles or packs products from bought-in materials can record its production in 4softerp.net. You define a one-level recipe, raise a production order, components are consumed from stock at cost, and the finished product is received with a journal entry.
What the production module covers
The module is deliberately simple. A recipe, also called a bill of materials (BOM), lists the components and quantities for one unit of a finished product. It has one level: components are bought or stocked items, not other recipes.
A production order says how many units you are making. Completing it moves stock and posts the accounting entry, so nothing is posted by hand. Components must be in stock at completion, and reservations can hold them for an order.
An example: souvenir gift boxes from Gozo
Consider a company in Gozo that assembles gift boxes for visitors. One box needs a carton, a jar of local honey, a bottle of olive oil and a printed card, all held in its warehouse.
The planner creates an order for 150 boxes. On completion the system takes 150 cartons, 150 jars, 150 bottles and 150 cards out of stock at current cost and receives 150 finished boxes. These are then sold like any other product, with a delivery.
How cost is built
The cost of the finished product is the cost of the components consumed. The entry records the consumption of components and the receipt of finished goods, so cost moves from component stock to finished-goods stock and the journal shows both sides.
The costing method of the component warehouse flows through: components held under FIFO are consumed oldest layer first, and the product takes that cost.
Labour and overhead are not added to product cost. If you need them carried in the cost of goods, handle that adjustment outside this module with your accountant.
What this module does not do
There is no automatic planning of what to make or buy, no multi-level assemblies and no lot or serial tracking in production. For a sub-assembly, make it as its own order first and then use it as a component.
- One-level recipes only.
- No automatic material planning.
- No batch or serial numbers in production.
- No labour or overhead in cost.
Planning around the module in practice
Before you create the first recipe, list the components with their units and check that each exists as a stocked product. A box that needs a carton, a jar and a card needs three product records and three quantities in the warehouse.
Tourism is seasonal, so producers can raise several production orders ahead of the summer peak and use reservations so that sales do not consume components needed for planned runs. After completion, check the journal entry once against your own calculation.
A few minutes on the first order builds confidence for every later one. Record scrap and wastage honestly: a recipe describes the standard quantity, so if real consumption is higher, note the reasons and adjust the recipe at the next review. Keep finished goods and components in separate warehouses if that helps your team see what is ready to ship.
Frequently asked questions
Can a recipe contain another recipe?
Not directly. Recipes have one level. Run a production order for the sub-assembly, receive it into stock and then use it as an ordinary component.
Is labour included in the product cost?
No. The cost of a finished product equals the cost of the components consumed. Adjust for labour and overhead outside the system if you need to.
Does the system plan production for me?
No. A planner creates each production order, and the system handles stock consumption, receipt and the accounting entry.