Production Orders and Bills of Materials for a Small US Workshop
Updated
A small workshop that assembles kits from stocked parts needs to know what a finished item costs in materials. 4softerp.net supports one-level recipes and production orders that consume components from stock and receive the finished product. This guide explains the flow and is clear about the limits.
A recipe with one level
A bill of materials, called a recipe in the ERP, lists the components and quantities needed to make one finished product. For a workshop LLC assembling a service kit, the recipe might be a case, a controller, a set of fasteners and a printed manual.
The recipe has a single level. Components are bought or stocked items; a component that is itself assembled from other parts cannot be nested inside the recipe.
Running a production order
When the workshop starts a batch, it creates a production order against the recipe. Completing the order consumes the components from the chosen warehouse at their stock cost, using the method that warehouse has, and receives the finished product into stock.
The system posts a journal entry for the movement, so the ledger reflects materials leaving the component stock and the finished kit entering the product stock.
What goes into the cost
The cost of the finished product is the cost of the components that were consumed. Labor and overhead are not added to it. If your workshop wants to carry wages or shop overhead into product cost, that allocation is done outside this module, for example by your accountant at year end.
- Components are valued by the warehouse method, weighted average or FIFO
- Finished goods enter stock at the consumed material cost
- Stock reservations can set components aside before a batch starts
- Stocktaking corrects any difference found on the shop floor
What is not included
There is no automatic material planning, no multi-level production, and no lot or serial tracking inside production orders. The team decides what to make and when, and checks component availability against stock.
For a three-LLC group with one workshop, this keeps the module simple: parts come from the warehouse company, the workshop company builds, and the owner sees both stock positions in one tenant.
Using the numbers in a small shop
With material cost per finished kit in hand, the workshop can compare what it spends on components with the price it charges the warehouse company or an outside buyer. When a supplier raises the price of a part, the next production order picks up the new cost, so the effect shows quickly.
Keep a simple habit: count the finished goods and the leftover components after each batch, and enter any difference through stocktaking. That keeps the recipe honest, because a recipe that does not match what the bench really uses will drift away from reality.
When a design changes, edit the recipe before the next order, not after it. Orders already completed keep the cost they were booked at, so history stays as it was recorded.
Frequently asked questions
Can a recipe contain another assembled product?
No. Recipes have one level only. Components are stocked items, and nested multi-level bills of materials are not supported, so a sub-assembly would have to be produced and stocked first as its own product.
Are labor and overhead added to product cost?
No. A production order consumes components at stock cost and receives the finished product at that material cost. Labor and overhead allocation is not part of the module, so any such allocation is handled outside it.
Does the ERP plan which materials to buy?
No. There is no MRP or automatic planning of materials. Your team checks the stock quantities in each warehouse and decides what to purchase before starting production orders.